Issuance Details - PMR 1
Submission No: S00281
MR Submission No: S00281_PMR01
Status: Issuance ACCs​
Project Title: Renewable energy project in Rajasthan by ABC Renewable Energy Pvt. Ltd.
PMR Title: PMR 1
Project Brief:

The project activity is the installation of new grid-connected 300 MW solar power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project is implemented in Rajasthan state of India by ABC Renewable Energy RJ-01 Private Limited. The electricity generated from project activity is exported to the grid in India thereby displacing electricity from the INDIAN grid electricity distribution system generated by fossil fuel-based power plants.  

Additional Information:

It is estimated that the project activity will generate an average of 784,878 MWh (average over 10 years) electricity per year which will lead to an average of 730,329 tCO2e (10 years’ average GHG emission reductions per year and effect a cumulative green power generation and GHG emission reductions of 7,848,785  MWh and 7,303,290  tCO2e over 10 years of its crediting period respectively.

Track Type: Regular
Project Kinds: Solar Power
Country: India
Registration Date: 27 April 2025
Migration Date: 28 April 2025
GCC Standard: 1.0
Focal Point One(as per PSF and LOA): EKI Energy Services Limited
Email of Contact person of Focal Point: manish@enkingint.org
Project Owner(s) (as per PSF & LOA): ABC Renewable Energy (RJ-01) Private Limited
Crediting Period Type: fixed
Crediting Period: 23 April 2022 01 January 0001 To 22 April 2032 01 January 0001
Monitoring Period: 23 April 2022 To 31 December 2024
Global Stakeholder Consultation Period: 04 August 2025 To 03 September 2025
Technical Details
  • Sectorial Scope: Energy industries
  • GCC /CDM Methodology and version:ACM0002 (Version - 21.0)
  • Claimed Market Eligibility: GCC Requirements
  • Issued Market Eligibility: GCC Requirements
  • Claimed HCLOA: Not Applicable
  • Issued HCLOA: Not Applicable
  • Claimed Corresponding Adjustment Verification Status: Others
  • Issued Corresponding Adjustment Verification Status: Others
  • Emission Reductions Claimed Issued
    Gross GHG Emission Reduction (tCO2e) For period before 1 January 2021 0 0
    Gross GHG Emission Reduction (tCO2e) For period from 1 January 2021 to 31 December 2023 1,115,695 1,115,695
    Gross GHG Emission Reduction (tCO2e) For period from 1 January 2024 to December 2026 689,188 689,188
    Gross GHG Emission Reduction (tCO2e) For period from 1 January 2027 Onward 0 0
Issuance Documents - PMR 1
Project Location
Goal Details
Claimed SDG Goals:
SDG-7
SDG-8
SDG-13
Issued SDG Goals:
SDG-7
SDG-8
SDG-13
Claimed SDG Label:
Silver
Issued SDG Label:
Silver
Label Details
  • Label Claimed Labels Issued Labels
  • E Plus Label Yes Yes
  • S Plus Label Yes Yes
  • EL Label No No
  • EBL Label No No
  • SL Label No No
  • SBL Label No No
  • AD+ Label NA NA
  • Regular Nature Based Removal Label (NR Label) No No
  • Enhanced Nature Based Removal Label (NR+ Label) No No
  • Technology Based Reduction/Removal Label (TR+ Label) No No
  • CORSIA Label (C+ Label) - Pilot Phase No No
  • CORSIA Label (C+ Label) - First Phase No No
  • ICVCM Label (CCP+ Label) No No
  • Article 6.2 Label (CA+ Label) No No
  • AREC No No
  • GCC Requirements Yes Yes